Order Helpline 01752 692 221
Order Helpline 01752 692 221

Hinged Cast Iron Gully Grid Cover 435L x 380W x 100H - D400 Loading

Code:
240230
Brand:
Free UK Delivery

This item is out of stock and not available to purchase.

Specially designed and manufactured to meet the requirements of the commercial and residential sectors, this Hinged Cast Iron Gully Grid Cover with a 100mm frame depth is available left or right-handed to suit your installation needs. Ideal for use in high-traffic applications ... Read More

Create a wishlist

"This certainly made the job much e…"

Mr T Whelan

Description

Specially designed and manufactured to meet the requirements of the commercial and residential sectors, this Hinged Cast Iron Gully Grid Cover with a 100mm frame depth is available left or right-handed to suit your installation needs.

Ideal for use in high-traffic applications such as carriageways, hard shoulders and pedestrian areas, as well as cul-de-sacs, car parks and access and estate roads, this Hinged Grid Cover is suitable for up to D400 loading, withstanding up to 40 tonnes. Fabricated from robust ductile iron, it ensures value for money, peace of mind and long-lasting performance.

Features & Benefits: Hinged Cast Iron Gully Grid Cover 435L x 380W x 100H - D400 Loading

  • Left or right-handed options available
  • Meets the requirements of commercial and residential sectors
  • Ideal for use in high-traffic applications such as carriageways, hard shoulders and pedestrian areas
  • Suitable for up to D400 loading, withstanding up to 40 tonnes
  • Fabricated from durable ductile iron
  • Long-lasting performance
  • 100mm frame depth
  • 435mm x 380mm clear opening
  • 530mm x 440mm external dimensions
  • 31.5kg weight

Supported by the comprehensive technical and customer service synonymous with Ham Baker Pipelines, this Gully Grid Cover combines the performance and high quality of the HB range. Fully compliant with the requirements of EN124 and third-party certified by the BSI Kitemark, it is made at a facility governed by the requirements of ISO9001, ISO14001 and ISO18001.

Dimensions

Length
435mm
Depth
100mm
Width
380mm

Details

Material
Cast Iron
Product Type
Gully Grid Cover
Weight Class
D400
Left Or Right Handed
Right Handed
Profile
Grid
Internal Dimensions
435mm x 380mm
External Dimensions
530mm x 440mm
Use Location
High Traffic
Highways
Main Roads
Public Car Parks
Load-Bearing Strength
40 Tonnes

Questions & Answers

There are currently no questions for this product.

Have a question about this product?

loading...

Product Enquiry Form

Hinged Cast Iron Gully Grid Cover 435L x 380W x 100H - D400 Loading

*Required Field