Order Helpline 01752 692 221
Order Helpline 01752 692 221

Cast Iron Manhole Cover and Frame 675L x 675W x 150H - F900 Loading

Code:
230598
Brand:
Free UK Delivery

This item is out of stock and not available to purchase.

Suited to areas subjected to heavy wheel loads such as aircraft pavements, container ports and docksides, this Cast Iron Manhole Cover and Frame comes equipped with an EN124 Group 6 F900 load classification to tolerate a 90-tonne test load. Alongside frame lifting points, LTS i... Read More

Create a wishlist

"helpfull delivery of product as…"

roger anthony smith

Description

Suited to areas subjected to heavy wheel loads such as aircraft pavements, container ports and docksides, this Cast Iron Manhole Cover and Frame comes equipped with an EN124 Group 6 F900 load classification to tolerate a 90-tonne test load.

Alongside frame lifting points, LTS installation and durability features, it boasts security and safety thanks to the skid-resistant radial chequer design and anti-theft locking option.

Features & Benefits: Cast Iron Manhole Cover and Frame 675L x 675W x 150H - F900 Loading

  • Frame lifting points, LTS installation and durability features
  • Boasts security and safety with skid-resistant radial chequer design and anti-theft locking option
  • F900 load classification to tolerate a 90-tonne test load
  • Customer-specific or generic badging available
  • 675mm x 675mm clear opening
  • 880mm x 880mm (external dimensions)
  • 150mm depth
  • 99kgs lid weight and 159kgs overall cover weight
  • 3.39N/sq. mm pressure bearing

Dimensions

Length
675mm
Depth
150mm
Width
675mm

Details

Material
Cast Iron
Product Type
Manhole Cover and Frame
Weight Class
F900
Profile
Solid Top
Internal Dimensions
675mm x 675mm
External Dimensions
880mm x 880mm
Use Location
Docks
Extreme Heavy Duty Applications
Airports
Load-Bearing Strength
90 Tonnes

Downloads

There are no product downloads to show.

Questions & Answers

There are currently no questions for this product.

Have a question about this product?

loading...

Product Enquiry Form

Cast Iron Manhole Cover and Frame 675L x 675W x 150H - F900 Loading

*Required Field